Preparation For Test - Section 22
Preparation For Test:
1. Model 202 up to 11/94: Check fuse F3-33 OK,
2. Model 202 as of 12/94: Check fuse F1-27 OK,
3. Provide access to PSE control module (A37/4, A37/5).
4. Connect socket box with test cable according to connection diagram.
Connection Diagram, Socket Box:
001 PSE control module connector
002 Test cable
003 Multimeter
004/050 Socket box (35-pole)
A37/5 PSE control module
Special Tools:
Conventional Tools, Test Equipment:
Description Brand, model, etc.
Multimeter 1) Fluke models 23, 83, 85, 87
1) Available through the MBNA Standard Equipment Program.