Preparation For Test - Section 22
1. Check fuses F2-5, F4-3 and F4-11.
2. Battery voltage 11 - 14 V.
3. Provide access to PSE control module (A37, A37/1).
4. Connect socket box with test cable according to connection diagram.
NOTE: After completion of testing, erase the PSE control module's diagnostic trouble code (DTC) memory, see Connection and Use of Test Equipment.
Special Tools:
Equipment
Multimeter 1) Fluke models 23, 83, 85, 87
1) Available through the MBNA Standard Equipment Program.
Connection Diagram - Socket Box
001 PSE control module connector
002 Test cable
003 Multimeter
004/050 Socket box (35-pole)
A37, A37/1 PSE control module