PSE Control Module (PSE)
Preparation For Test
1. Connect impulse counter scan tool or Hand-Held Tester (HHT) to X11/4, according to diagram. Scan Tool Testing and Procedures
Notes:
1. Read Out Diagnostic Trouble Codes (DTC's) and record.
2. Rectify faults according to table.
3. Interrupt voltage to PSE control module for approx. 3 seconds, to erase the safety memory.