Operation CHARM: Car repair manuals for everyone.

C1165




C1164, C1165 CV SYSTEM

DTC Logic


DTC DETECTION LOGIC







DTC CONFIRMATION PROCEDURE


1. PRECONDITIONING

If "DTC CONFIRMATION PROCEDURE" has been previously conducted, always turn power switch OFF and wait at least 10 seconds before conducting the next test.
- GO TO 2.

2. CHECK DTC DETECTION

With CONSULT
1.Turn the power switch OFF ON.

CAUTION:
- Be sure to wait of 10 seconds after turning power switch OFF or ON.
- Set the vehicle to READY.
2.Repeat step 1 two or more times.
3.Perform self-diagnosis for "ABS".
Is DTC "C1164" or "C1165" detected?
YES- Proceed to "Diagnosis Procedure" .
NO- INSPECTION END


Diagnosis Procedure


1. CHECK CONNECTOR

1.Turn the power switch OFF.
2.Check the ABS actuator and electric unit (control unit) harness connector for disconnection or looseness.
Is the inspection result normal?
YES- GO TO 3.
NO- Repair or replace error-detected parts, securely lock the connector, and GO TO 2.

2. PERFORM SELF-DIAGNOSIS (1)

With CONSULT
1.Turn the power switch OFF ON.

CAUTION:
- Be sure to wait of 10 seconds after turning power switch OFF or ON.
- Set the vehicle to READY.
2.Repeat step 1 two or more times.
3.Perform self-diagnosis for "ABS".
Is any "C1164" or "C1165" detected?
YES- GO TO 3.
NO- INSPECTION END

3. CHECK CUT VALVE POWER SUPPLY

1.Turn the power switch OFF.
2.Disconnect ABS actuator and electric unit (control unit) harness connector.
3.Check the voltage between ABS actuator and electric unit (control unit) harness connector and ground.





4.Turn the power switch ON.

CAUTION:
Never set the vehicle to READY.
5.Check the voltage between ABS actuator and electric unit (control unit) harness connector and ground.





Is the inspection result normal?
YES- GO TO 5.
NO- GO TO 4.

4. CHECK CUT VALVE POWER SUPPLY CIRCUIT

1.Turn the power switch OFF.
2.Check the 50A fusible link (#J).
3.Check the continuity and short circuit between ABS actuator and electric unit (control unit) harness connector terminal (2) and 50A fusible link (#J).
Is the inspection result normal?
YES- Perform trouble diagnosis for 12V battery power supply. Refer to "Wiring Diagram BATTERY POWER SUPPLY -" Battery Power Supply.
NO- Repair or replace error-detected parts.

5. CHECK CUT VALVE GROUND CIRCUIT

1.Turn the power switch OFF.
2.Check the continuity between ABS actuator and electric unit (control unit) harness connector and the ground.





Is the inspection result normal?
YES- GO TO 6.
NO- Repair or replace error-detected parts.

6. CHECK TERMINAL

Check the ABS actuator and electric unit (control unit) pin terminals for damage or loose connection with harness connector.
Is the inspection result normal?
YES- Replace ABS actuator and electric unit (control unit). Refer to "Removal and Installation" Removal And Installation.
NO- Repair or replace error-detected parts.