Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Note
To Grind Valves, Add2.20.0A
With AC, Add
Right Bank0.50.0A
Left Bank0.20.0A
Both Banks0.50.0A
With Cruise Control, Add0.40.0A
One CYL
Right Bank10.80.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Left Bank10.60.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Both Banks15.00.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
All Cyls
Right Bank12.90.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Left Bank12.70.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Both Banks18.20.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.