Connecting Rod: Labor Times
Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes | |
Replace | ||||
Add Following Operations If Performed With Piston & Ring Jobs | ||||
Main Bearings, Renew | 1.3 | 0.0 | A | |
Crankshaft, Renew | 3.5 | 0.0 | A | Does Not Include: R&R Engine. |
Oil Pump, Renew | 0.6 | 0.0 | A | |
Oil Pump Screen, Clean | 0.2 | 0.0 | A | |
Rear Main Oil Seal, Renew | 1.1 | 0.0 | A | |
Timing Chain or Gears, Renew | 1.1 | 0.0 | A | |
Tune-Up | 0.6 | 0.0 | A | |
Valves, Grind | ||||
See Valves Grind Head Removed And Combinations. | ||||
One CYL | ||||
Right Bank | 8.3 | 0.0 | A | Include: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
Left Bank | 8.2 | 0.0 | A | Include: R&R Cylinder Heads & Oil Pan, Hone Cylinder Walls And Plastigage Bearings. |
Note | ||||
With AC, Add | 0.5 | 0.0 | A | |
With Cruise Control, Add | 0.4 | 0.0 | A | |
With C.C.C., Add | 0.5 | 0.0 | A | |
With PS, Add | 0.7 | 0.0 | A | |
Each Additional | 0.7 | 0.0 | A | |
Note | ||||
With AC, Add | 0.5 | 0.0 | A | |
With Cruise Control, Add | 0.4 | 0.0 | A | |
With PS, Add | 0.7 | 0.0 | A | |
With C.C.C., Add | 0.5 | 0.0 | A | |
All Cyls | ||||
Right Bank | 9.5 | 0.0 | A | |
Left Bank | 9.4 | 0.0 | A | |
Both Banks | 13.9 | 0.0 | A | |
Note | ||||
With AC, Add | 0.5 | 0.0 | A | |
With Cruise Control, Add | 0.4 | 0.0 | A | |
With PS, Add | 0.7 | 0.0 | A | |
With C.C.C., Add | 0.5 | 0.0 | A |