Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Right Bank8.05.7AIncludes: R&R Cylinder Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank8.56.1AIncludes: R&R Cylinder Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls12.99.2AIncludes: R&R Cylinder Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.80.5AIncludes: R&R Cylinder Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
With A.I.R., Add0.80.5AIncludes: R&R Cylinder Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
With C.C.C., Add0.50.3AIncludes: R&R Cylinder Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
With Cruise Control, Add0.40.2AIncludes: R&R Cylinder Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.