Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.40.0AAdd Any Of The Following Operations If Performed Along With Pistons & Ring Jobs
Crankshaft, Renew2.20.0ADoes Not Include: R&R Engine.
Oil Pump, Renew1.10.0ADoes Not Include: R&R Engine.
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine.
Rear Main Oil Seal, Renew1.40.0ADoes Not Include: R&R Engine.
Timing Chain, Renew0.60.0ADoes Not Include: R&R Engine.
One Cylinder
Right Bank10.57.5AIncludes R&R Oil Pan Cylinder Head & Plastigage Bearings
Left Bank10.07.0AIncludes R&R Oil Pan Cylinder Head & Plastigage Bearings
Both Banks13.710.2AIncludes R&R Oil Pan Cylinder Head & Plastigage Bearings
All Cylinders
Right Bank13.010.0AIncludes R&R Oil Pan Cylinder Head & Plastigage Bearings
Left Bank12.59.5AIncludes R&R Oil Pan Cylinder Head & Plastigage Bearings
Both Banks17.212.2AIncludes R&R Oil Pan Cylinder Head & Plastigage Bearings