Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew0.90.0A
Crankshaft, Renew4.10.0A
Oil Pump, Renew0.80.0A
Timing Chain & Gears, Renew0.90.0A
Note
To Grind Valves, Add1.71.2
One CYL
Right Bank9.26.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank7.85.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks11.98.5AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Each Additional0.70.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
All Cyls
Right Bank10.47.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank9.06.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks13.69.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.