Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew0.60.0B
Crankshaft, Renew3.70.0BIncludes: R&R Engine
Oil Pump, Renew1.20.0B
Timing Chain, Renew1.20.0B
Tune-Up0.60.0B
One Cylinder
Right Bank9.76.9BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Left Bank8.35.9BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Both Banks12.28.7BIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinders And Plastigage Bearings.
Note
With AC, Add0.80.5B
With A.I.R., Add0.50.3B
All Cylinders
Note
With AC, Add0.80.5B
With A.I.R., Add0.50.3B
Right Bank10.47.4B
Left Bank9.06.4B
Both Banks14.810.6B