Operation CHARM: Car repair manuals for everyone.

Engine: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Complete Assembly With Transfer of Parts11.40.0BIncludes: Transfer All Fuel And Electrical Units. Does Not Include: Transfer Of Optional Equipment.
NOTE
With AC, Add0.70.0B
With A.I.R., Add0.50.0B
Complete Assembly Without Transfer of Parts7.40.0BDoes Not Include: Transfer Of Any Part Of Engine Or Replacement Of Optional Equipment.
NOTE
With AC, Add0.70.4B
With A.I.R., Add0.80.5B
Long Block15.90.0AIncludes: R&R Engine And Transfer All Necessary Components Not Supplied With Long Block.
NOTE
With A/C, Add0.50.0A
With A.I.R. Pump, Add0.70.0AIncludes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up.
With Locking Wheel Covers, Add0.20.0A
With Locking Lug Nuts, Add0.20.0A
Short Block19.20.0AIncludes: R&R Engine And Trasnfer All Necessary Components.
NOTE
With AC, Add1.00.7A
With A.I.R., Add0.80.5A
To Grind Valves, Add2.82.0A
Overhaul/Rebuild27.10.0AIncludes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up.
NOTE
With A/C, Add0.50.0A
With A.I.R. Pump, Add0.70.0AIncludes: Measure Cylinder Bores, Crankshaft & Pistons For Proper Size & Hone Cylinders. Renew Pistons. Rings. Pins. Main & Rod Bearings, Grind Valves & Tune-Up.
With Locking Wheel Covers, Add0.20.0A
With Locking Lug Nuts, Add0.20.0A