Operation CHARM: Car repair manuals for everyone.

Clutch: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
4T65E
4TH Clutch11.88.5AIncludes: R&I Transaxle.
Note
To Overhaul 3-4 Accumulator, Add0.20.2A
To Overhaul Valve Body, Add1.21.0A
To Overhaul Oil Pump, Add0.40.3A
To Overhaul Carrier/Differential Final Drive Assembly, Add1.00.8A
2ND Clutch12.78.9AIncludes: R&I Transaxle.
Note
To Overhaul Carrier/Differential Final Drive Assembly, Add1.00.8A
3RD Clutch12.79.3AIncludes: R&I Transaxle.
Note
To Overhaul Carrier/Differential Final Drive Assembly, Add1.00.8A
Input Clutch12.79.3AIncludes: R&I Transaxle.
Note
To Overhaul Carrier/Differential Final Drive Assembly, Add1.00.8A
4T60E
2ND Clutch9.86.8AIncludes: R&I Transaxle.
3RD Clutch10.87.4AIncludes: R&I Transaxle.
Input Clutch10.87.4AIncludes: R&I Transaxle.
Transaxle Fourth Clutch Assembly8.86.2AIncludes: R&I Transaxle.