Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder6.60.0AIncludes: R&R Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cylinders9.50.0AIncludes: R&R Head And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Piston or Connecting Rods
Add the Following If Performed With Piston & Ring Jobs
Main Bearings, Renew3.70.0A
Crankshaft, Renew4.00.0A
Oil Pump, Renew1.20.0A
Oil Pump Screen, Clean0.20.0A
Timing Belt, Renew0.40.0A
Tune-Up0.50.0A