Power Door Lock Control Module: Testing and Inspection
1. Check terminals (2) and (3) for 12 volts.
2. Verify that the voltage on terminal (3) is reduced to 0V when terminal (4) or (5) is connected to the ground and returns to 12 V in about 0.5 second.
3. Verify that the voltage on terminal (2) is reduced to 0V when terminal (4) or (5) is disconnected from the ground, and returns to 12 V in about 0.5 second.