Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL7.35.2AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.40.2A
To Replace Cylinder Head, Add2.71.9A
To Grind Valves, Add
One CYL0.70.4A
All Cyls2.01.4A
Each Additional1.00.7A
Note
With AC, Add0.40.2A
To Replace Cylinder Head, Add2.71.9A
To Grind Valves, Add
One CYL0.70.4A
All Cyls2.01.4A
Add Following Operations If Performed With Piston & Ring Jobs.
Main Bearings, Renew3.50.0A
Crankshaft, Renew3.50.0A
Oil Pump, Renew0.70.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew1.50.0A
Timing Belt, Renew0.80.0A
Tune-Up0.50.0A