Operation CHARM: Car repair manuals for everyone.

Piston: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL
Front Bank7.35.2AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Rear Bank8.05.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Both Banks8.86.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.00.0A
Crankshaft, Renew3.30.0A
Oil Pump, Renew1.70.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew1.80.0A
Timing Belt, Renew0.70.0A
Valve Lifters, Renew
Front Bank0.30.0A
Rear Bank0.60.0A
Both Banks0.80.0A
Camshaft, Renew
Front1.10.0A
Rear1.10.0A
Tune-Up0.60.0A
Note
With AC, Add0.40.2A
To Replace Cylinder Head, Add
One Bank2.71.9A
Both Bank5.33.8A
To Grind Valves, Add5.03.6A
Each Additional1.00.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.