P0750
Test 1 Through 2:
Test 3 Through 7:
Test 8 Through 11:
Symptom:
P0750-LR SOLENOID CIRCUIT
When Monitored and Set Condition:
P0750-LR SOLENOID CIRCUIT
When Monitored: Initially at power-up, then every 10 seconds thereafter. The solenoids will also be tested immediately after a gear ratio or pressure switch error is detected.
Set Condition: Three consecutive solenoid continuity test failures, or one failure if test is run in response to a gear ratio or pressure switch error.
POSSIBLE CAUSES
RELATED RELAY DTC'S PRESENT
INTERMITTENT WIRING & CONNECTORS CONDITIONS
TRANSMISSION RELAY OUTPUT CIRCUIT OPEN
L/R SOLENOID CONTROL CIRCUIT OPEN
L/R SOLENOID CONTROL CIRCUIT SHORT TO GROUND
L/R SOLENOID CONTROL CIRCUIT SHORT TO VOLTAGE
L/R SOLENOID INOPERATIVE
TCM - L/R SOLENOID CIRCUIT