Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Note
To Grind Valves, Add3.80.0A
With AC, Add
Right Bank0.40.0A
Left or Both Banks0.80.0A
With C.C.C., Add0.50.0A
With Cruise Control, Add0.20.0A
One CYL
Right Bank10.80.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Left Bank10.80.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Both Banks14.10.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
All Cyls
Right Bank12.50.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Left Bank12.50.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.
Both Banks17.10.0AIncludes: R&R Cylinder, Oil Pan And Plastigage Bearings.