Operation CHARM: Car repair manuals for everyone.

Piston Ring: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank10.77.7Includes: R&R Cylinder Heads And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Left Bank10.17.1Includes: R&R Cylinder Heads And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cylinders15.811.3Includes: R&R Cylinder Heads And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.70.4Includes: R&R Cylinder Heads And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
With Cruise Control, Add0.40.2Includes: R&R Cylinder Heads And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
With PS, Add0.50.3Includes: R&R Cylinder Heads And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
One Cylinder, Each Bank13.910.4Includes: R&R Cylinder Heads And Oil Pan, Hone Cylinder Walls And Plastigage Bearings.