| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Resurface/Grind |
All Valves | 12.2 | 0.0 | A | Includes: R&R Cylinder Heads, Clean Carbon And Make All Necessary Adjustments. |
Add the Following Operations If Performed With Valves, Grind |
Valve Guides, Knurl |
Each | 0.1 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
Valve Guides, Renew |
Each | 0.2 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
NOTE |
To Ream Guide, Add | 0.1 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
Rocker Arm & Shaft Assembly, Overhaul |
Each Shaft | 0.5 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
Valve Lifters, Renew | 1.8 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
Timing Chain | 1.2 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
Camshaft, Renew | 3.0 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |
Tune-Up | 0.6 | 0.0 | A | Add The Following Operations If Performed Along With Valve Grind. |