Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew3.00.0AAdd The Following Operations If Performed Along With Piston & Ring Operations.
Crankshaft, Renew5.10.0ADoes Not Include: R&R Engine.
Oil Pump, Renew1.90.0ADoes Not Include: R&R Engine.
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine.
Rear Main Seal, Renew
Manual Trans3.00.0ADoes Not Include: R&R Engine.
Auto Trans2.20.0ADoes Not Include: R&R Engine.
Timing Chain, Renew4.60.0ADoes Not Include: R&R Engine.
Tune-Up0.50.0ASee Valves, Grind Head Removed And Combinations. 5.6
Note
With AC, Add0.70.4AIncludes: R&R Cylinder Head, Oil Pan And Plastigage Bearings.
With Cruise Control, Add0.20.1AIncludes: R&R Cylinder Head, Oil Pan And Plastigage Bearings.
One8.96.9AIncludes: R&R Cylinder Head, Oil Pan And Plastigage Bearings.
All12.48.9AIncludes: R&R Cylinder Head, Oil Pan And Plastigage Bearings.