Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.70.0AAdd The Following Operations If Performed Along With Piston & Ring Operations.
Crankshaft, Renew3.70.0ADoes Not Include: R&R Engine.
Oil Pump, Renew1.40.0ADoes Not Include: R&R Engine.
Oil Pump Screen, Clean0.20.0ADoes Not Include: R&R Engine.
Rear Main Seal, Renew
Manual Trans3.10.0ADoes Not Include: R&R Engine.
Auto Trans3.00.0ADoes Not Include: R&R Engine.
Timing Chain, Renew2.20.0ADoes Not Include: R&R Engine.
Tune-Up0.60.0ASee Valves, Grind Head Removed And Combinations. 5.6
One Cylinder
Right Bank11.97.9AIncludes: R&R Cylinder Head, Oil Pan And Plastigage Bearings.
Left Bank11.97.9AIncludes: R&R Cylinder Head, Oil Pan And Plastigage Bearings.
Both Banks14.49.4AIncludes: R&R Cylinder Head, Oil Pan And Plastigage Bearings.
All Cylinders
Right Bank13.49.4AIncludes: R&R Cylinder Head, Oil Pan And Plastigage Bearings.
Left Bank13.49.4AIncludes: R&R Cylinder Head, Oil Pan And Plastigage Bearings.
Both Banks20.312.3AIncludes: R&R Cylinder Head, Oil Pan And Plastigage Bearings.