Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One Cylinder
Right Bank12.48.4AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Left Bank12.68.6AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Both Banks15.710.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
All Cylinders18.911.9AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Each Additional1.00.7AIncludes: R&R Cylinder Head, Oil Pan & Plastigage Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Crankshaft, Renew4.00.0AAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Main Bearings1.00.0AAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Oil Pump, Renew0.80.0AAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Oil Pump Screen, Clean0.20.0AAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Rear Main Oil Seal, Renew1.40.0AAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Timing Chain or Gear, Renew1.50.0AAdd The Following Operations If Performed Along With Piston Or Ring Operations.
Tune-Up0.60.0ASee Valves, Grind (Head Removed) & Combinations.