Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.00.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Crankshaft, Renew3.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Oil Pump, Renew1.40.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Timing Belt, Renew0.70.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
Tune-Up0.50.0AAdd Any Of The Following Operations If Performed Along With Piston & Ring Jobs.
One CYL8.46.0AIncludes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings.
Each Additional0.70.4AIncludes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings.
All Cyls9.97.1AIncludes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings.