Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.20.0A
Crankshaft, Renew5.40.0A
Oil Pump, Renew1.50.0A
Oil Pump Screen, Clean0.20.0A
Rear Main Oil Seal, Renew
Manual Trans1.70.0A
Auto Trans1.70.0A
Timing Belt, Renew1.00.0A
Tune-Up0.50.0A
Note
To Grind Valves, Add2.21.6A
With AC, Add0.50.3A
With PS, Add0.40.2A
With Turbo, Add1.81.3A
One CYL7.85.6AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
Each Additional0.70.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.
All Cyls9.46.7AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigage Bearings.