Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Each Additional0.70.4AIncludes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings.
One CYL8.86.5AIncludes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings.
All Cyls10.87.6AIncludes: R&R Cylinder Head, Oil Pan & Hone Cylinder Walls And Plastigage Bearings.
Note
With AC, Add0.40.2A
To Grind Valves, Add2.21.6A
Add Following Operations If Performed With Piston & Ring Jobs
Main Bearings, Renew1.30.0A
Oil Pump, Renew1.60.0A
Tune-Up0.50.0A
Crankshaft, Renew3.50.0A
Timing Belt, Renew0.70.0A