Air Distributor Duct Replacement
Air Distributor Duct Replacement
REMOVAL PROCEDURE
1. Remove the I/P carrier.
2. Place the I/P carrier face down on a clean work surface.
3. Remove the air distributor duct bolts.
4. Remove the air distributor from the I/P carrier.
INSTALLATION PROCEDURE
1. Install the air distributor to the I/P carrier.
NOTE: Refer to Fastener Notice in Service Precautions.
2. Install the air distributor duct bolts.
Tighten
Tighten the air distributor duct bolts to 2.2 N.m (19 lb in).
3. Install the I/P carrier.