Instrument Cluster Programming and Setup
Instrument Cluster Programming and Setup
The instrument panel cluster (IPC) must be setup using the service programming system (SPS). Refer to Service Programming System (SPS) (Programming and Relearning) .
The IPC requires 3 different SPS programming events to be successfully programmed. Using TIS 2 Web perform the IPC programming and setup in the following order:
1. "IPC Instrument Panel Cluster"
2. "IPC IPC Configuration"
3. "IPC IPC Setup"