Operation CHARM: Car repair manuals for everyone.

Cylinder Head Assembly: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
Without Valve Job
Right Bank13.79.9BAfter Engine Is Removed.
Left Bank13.79.9BAfter Engine Is Removed.
Both Banks18.813.2BAfter Engine Is Removed.
Overhaul/Rebuild
Right Bank16.711.9BIncludes: R&R Cylinder Heads, Lap Valves, Reface Valve Guides, Valves, Springs And/Or Replace If Necessary. After Engine Is Removed.
Left Bank16.711.9BIncludes: R&R Cylinder Heads, Lap Valves, Reface Valve Guides, Valves, Springs And/Or Replace If Necessary. After Engine Is Removed.
Both Banks23.816.9BIncludes: R&R Cylinder Heads, Lap Valves, Reface Valve Guides, Valves, Springs And/Or Replace If Necessary. After Engine Is Removed.