Operation CHARM: Car repair manuals for everyone.

Removal and Replacement



Removing And Installing Three-Phase Generator

Preliminary work

Preliminary work - three-phase generator
Disconnect battery.

Removing three-phase generator










1. Unscrew the two fastening screws -1, 2- and remove together with the deflection roller.







2. Unscrew the two fastening screws -3- for the vacuum modulator.







3. Lift the right generator over the bracket on the engine -A-, then pull forwards and down -B- and raise clear of the engine from the rear -C-.







4. Release and unplug the electrical connector -A-.
5. Unscrew fastening nut -B- for the B+ lead -4- and remove the B+ lead.

Installing three-phase generator










1. Place the three-phase generator on the engine and fit the B+ lead -4-, tightening with the fastening nut -B-. - Tightening torque: 11 ft.lb.
2. Press in the electric plug until it clicks into place.







3. Insert the three-phase generator into the engine area -C-, then push upwards -B- and lift over the bracket -A-.







4. Position vacuum modulator over the three-phase generator and screw it down with the fastening screws -3-. Tightening torque: 6.5 ft.lb.







5. Screw down three-phase generator with the two fastening screws -1, 2-. Tightening torque: 34 ft.lb.

Subsequent work

Subsequent work - three-phase generator
Connect battery.