Fluid Line/Hose: Service and Repair
Removing and installing line for ATF cooling
Preliminary work for line for ATF cooling
1. Remove engine and transmission.
Removing line for ATF cooling
1. Unscrew fastening screws securing line for ATF cooling to transmission -4-.
ATF line
2. Unscrew fastening screws securing holder to engine -4-.
ATF line
3. Unscrew fastening screws securing line for ATF cooling to connection point -5-.
4. Remove line for ATF cooling.
Installing line for ATF cooling
1. Replace sealing rings on the ATF lines.
Sealing rings on ends of ATF lines
2. Install line for ATF cooling.
3. Screw in fastening screws securing line for ATF cooling to connection point -5-. -> Tightening torque: 10 Nm (7.5 ftlb.)
4. Screw in fastening screws securing holder to engine -4-. -> Tightening torque: 10 Nm (7.5 ftlb.)
ATF line
5. Screw in fastening screws securing line for ATF cooling to transmission -4-. -> Tightening torque: 10 Nm (7.5 ftlb.)
ATF line
Subsequent work for line for ATF cooling
1. Install engine and transmission.
2. Check ATF.