Operation CHARM: Car repair manuals for everyone.

Connecting Rod: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Replace
One CYL10.87.8AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
Each Additional0.70.4AIncludes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings.
Add Following Operations If Performed With Piston & Ring Jobs
Timing Chain, Renew1.70.0A
Valve Lifters, Renew
One0.40.0A
All0.50.0A
Camshaft, Renew2.30.0A
Oil Pump, Renew1.90.0A
Oil Pump Screen, Clean1.30.0A
Rear Main Oil Seal, Renew
Manual Trans2.90.0A
Auto Trans3.10.0A
Tune-Up0.40.0A
Note
With AC, Add1.10.8A
With PS, Add0.50.3A
To Replace Valve Cover Gasket, Add0.50.3A