Installation
TX6A AUTOMATIC TRANSMISSION / TRANSAXLE: PARK / NEUTRAL POSITION SWITCH: INSTALLATION; 2013 MY FR-S [03/2012 -]
1. INSTALL PARK/NEUTRAL POSITION SWITCH ASSEMBLY
(a) Clean the bolt and the bolt hole.
(b) Apply adhesive to 2 or 3 threads on the end of the bolt.
Adhesive:
Toyota Genuine Adhesive 1344, Three Bond 1344 or equivalent
(c) Temporarily install the park/neutral position switch assembly with the bolt.
HINT
Tighten the bolt to the specified torque when adjusting the park/neutral position switch assembly.
(d) Install a new lock washer and the nut to the park/neutral position switch assembly.
Torque : 6.9 Nm (70 kgf-cm, 61 in-lbf)
(e) Temporarily install the transmission control shaft lever RH.
(f) Turn the transmission control shaft lever RH counterclockwise until it stops, and turn it clockwise 2 notches to set it to the N position.
(g) Remove the transmission control shaft lever RH.
(h) Align the neutral basic line with the groove as shown in the illustration, and tighten the bolt.
Torque : 13 Nm (130 kgf-cm, 9 ft-lbf)
(i) Using a screwdriver, bend the tabs of the lock washer.
(j) Connect the park/neutral position switch connector.
2. INSTALL TRANSMISSION CONTROL SHAFT LEVER RH
(a) Install the transmission control shaft lever RH with the spring washer and nut.
Torque : 16 Nm (160 kgf-cm, 12 ft-lbf)
3. CONNECT FLOOR SHIFT GEAR SHIFTING ROD SUB-ASSEMBLY
(a) Apply MP grease to the pin.
(b) Install the floor shift gear shifting rod sub-assembly to the transmission control shaft lever RH with the spacer, pin and clip.
HINT
Install the pin from the right side of the vehicle.
4. INSTALL FRONT EXHAUST PIPE ASSEMBLY
Installation
5. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL Installation
6. INSPECT SHIFT LEVER POSITION Initial Inspection and Diagnostic Overview
7. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY Initial Inspection and Diagnostic Overview