Electric Load Sensor Diode: Testing and Inspection
Electric Load Signal Diode:
1. Disconnect negative cable at battery.
2. Disconnect coupler from diode.
The diode is installed on A/T control unit.
3. Remove diode from A/T control unit.
4. Check that there is continuity between terminals 6 and 7 only when battery is connected to terminals 1 and 7.
NOTE: Be sure to connect negative terminals of ohmmeter and battery to terminal 7. Otherwise, accurate operation check would be impossible.