7. Left Case Installation
Left Case Installation1. If input oil gutter has been removed, install it with bolt to which thread lock cement has been applied.
"A": Thread lock cement 99000-32110
Tightening torque
Input oil gutter bolt (a): 10 Nm (1.0 kgf-cm, 7.5 ft. lbs.)
2. Install differential side oil seal (1) until it becomes flush with differential side bearing retainer surface by using special tool with hammer, and then apply grease to its lip.
NOTE: Face oil seal spring side inward.
"B": Grease 99000-25010
Special Tool (A): 09913-75520
3. Install countershaft left bearing cup into case bore by tapping it with plastic hammer lightly.