Operation CHARM: Car repair manuals for everyone.

Valve: Labor Times

Standard HoursManufacturer Warranty HoursSkill LevelNotes
Resurface/Grind
All Valves10.00.0AIncludes: R&R Cylinder Head And Make All Necessary Adjustments.
Note
With PS, Add0.40.0A
Add the Following Operations If Performed With Valves, Grind
Valve Guides, Knurl
Each0.20.0A
Valve Guides, Renew
Each0.30.0A
Note
To Ream Guide, Add0.10.0A
Rocker Shaft Assembly, Renew
Each0.50.0A
Timing Belt, Renew1.60.0A
Each1.00.0A
Camshaft, Renew
Both3.20.0A
Tune Up0.50.0A
Head Removed
Corolla4.30.0ADoes Not Include: R&R Cylinder Head.
Tercel4.60.0ADoes Not Include: R&R Cylinder Head.