Audible Warning Device: Testing and Inspection
INSPECT WIRELESS DOOR LOCK BUZZER OPERATION
Connect the positive (+) lead from the ohmmeter to terminal 1 and the negative (-) lead to terminal 2, and measure the resistance of approximately 1 kOhm
If resistance is not as specified, replace the buzzer.