Operation CHARM: Car repair manuals for everyone.

Inspection

INSPECT CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY




a. Using an ohmmeter, measure the resistance between the terminals.

Standard: 6.9 to 7.9 Ohms at 20 degree C (68 degree F)




b. Connect the battery's positive (+) lead to terminal 1 and negative (-) lead to terminal 2. Check the movement of the valve.

If operation is not as specified, replace the valve.