Installation
2GR-FE ENGINE CONTROL: CAMSHAFT OIL CONTROL VALVE: INSTALLATION
INSTALLATION
1. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE ASSEMBLY
(a) Apply a light coat of engine oil to 4 new O-rings and install them to the 4 camshaft timing oil control valve assemblies.
Text in Illustration
(b) Install the 4 oil control valves with the 4 bolts.
Torque: 10 Nm (102 kgf-cm, 7ft-lbf)
NOTICE: Make sure that each O-ring is not cracked or does not jump out of position during installation.
(c) Connect the 4 oil control valve connectors.
(d) Install the bolt and connect the wire harness clamp to install the engine wire.
Torque: 14 Nm (138 kgf-cm, 10ft-lbf)
2. INSTALL INTAKE AIR SURGE TANK ASSEMBLY Installation
3. INSTALL AIR CLEANER CAP WITH HOSE Installation
4. ADD ENGINE COOLANT Service and Repair
5. INSPECT FOR ENGINE COOLANT LEAK Testing and Inspection
6. INSPECT FOR OIL LEAK
(a) Start the engine, and check that there are no oil leaks.
7. INSTALL V-BANK COVER SUB-ASSEMBLY Installation
8. INSTALL COOL AIR INTAKE DUCT SEAL Installation
9. INSTALL COWL TOP PANEL OUTER SUB-ASSEMBLY Installation
10. INSTALL WINDSHIELD WIPER MOTOR AND LINK ASSEMBLY
(a) Install the windshield wiper motor and link assembly Installation.
11. INSTALL NO. 2 ENGINE UNDER COVER
12. INSTALL NO. 1 ENGINE UNDER COVER