IG Power Source Circuit
HEATING / AIR CONDITIONING: AIR CONDITIONING SYSTEM (for Manual Air Conditioning System): IG Power Source Circuit
IG Power Source Circuit
DESCRIPTION
The main power source is supplied to the A/C amplifier when the ignition switch is ON.
The power source is used for operating the A/C amplifier and servo motor, etc.
WIRING DIAGRAM
INSPECTION PROCEDURE
NOTICE: Inspect the fuses for circuits related to this system before performing the following inspection procedure.
HINT: Start the engine before inspection. Check the IG1 relay or battery if the engine does not start.
PROCEDURE
1. INSPECT A/C AMPLIFIER
(a) Remove the A/C amplifier with its connectors still connected.
(b) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Text in Illustration
NG -- CHECK HARNESS AND CONNECTOR (A/C AMPLIFIER - BATTERY)
OK -- PROCEED TO NEXT SUSPECTED AREA SHOWN IN PROBLEM SYMPTOMS TABLE
2. CHECK HARNESS AND CONNECTOR (A/C AMPLIFIER - BATTERY)
(a) Disconnect the A/C amplifier connector.
(b) Measure the voltage according to the value(s) in the table below.
Standard Voltage:
Text in Illustration
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- Continue to next step.
3. CHECK HARNESS AND CONNECTOR (A/C AMPLIFIER - BODY GROUND)
(a) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Text in Illustration
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- REPLACE A/C AMPLIFIER