| Standard Hours | Manufacturer Warranty Hours | Skill Level | Notes |
Replace | 9.5 | 6.8 | A | Includes: R&R Cylinder Head & Oil Pan, Hone Cylinder Walls And Plastigauge Bearings. |
Add Following Operations If Performed With Piston & Ring Jobs |
Main Bearings, Renew | 4.6 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Operations. |
Crankshaft, Renew | 4.6 | 0.0 | A | Add The Following Operations If Performed Along With Piston Or Ring Operations. |
Oil Pump, Renew | 1.4 | 0.0 | A | After Oil Pan Is Removed. |
Oil Pump Screen, Clean | 0.2 | 0.0 | A | After Oil Pan Is Removed. |
Rear Main Oil Seal, Renew | 2.0 | 0.0 | A | After Oil Pan Is Removed. |
Timing Belt, Renew | 0.5 | 0.0 | A | After Oil Pan Is Removed. |
Tune-Up | 0.5 | 0.0 | A | See Valves, Grind Head Removed And Combinations. |