Starter Motor: Service and Repair
Starter
Special tools, testers and auxiliary items required
• Scissor Lift Table (VAS 6131)
Removing
• Engine/transmission assembly removed and secured to (VAS 6131).
- Remove bolts - arrows - at front left and right transmission mounts.
- Remove bolt - arrow -.
- Detach coolant pipe (bottom right) from coolant hose - 1 -.
• Disregard item - 2 -.
- Turn the spindles for support elements - 2 - (left and right) at subframe all the way down.
- Remove the locating lugs from the spindles.
- Remove the subframe - 3 - to the side.
• Two technicians are required to remove subframe.
- Turn the spindles for support elements - 1 - (left and right) at engine support - 4 - all the way down.
- Remove bolts - arrows - at left and right engine mounts.
- Remove engine support.
- Detach coolant hoses - arrows -.
- Remove bolt - 1 -.
- Remove the coolant flange at oil cooler.
- Disconnect electrical harness connector - arrow - at right engine mount.
- Remove bolts - 1 through 6 -.
- Remove engine support with engine mount.
- Remove ground (GND) wire - 4 - from starter.
- Remove the electrical wires - 2 - and - 3 - from the starter.
- Remove bolts - 1 - and - 5 - and remove starter.
Installing
Install in reverse order of removal, observing the following:
• Attach all cable ties at the same locations when installing.
• Secure all hose connections using standard hose clamps.
• Replace O-ring
- Install engine.
- Connect battery. Required actions, refer to => [ To connect, connect terminal clamp of ground (GND) wire by hand to battery negative terminal and tighten nut. ] Battery, Disconnecting and Connecting.
Tightening Specifications