Operation CHARM: Car repair manuals for everyone.

Test L: The Blower Motor Is Inoperative - EMTC

PINPOINT TEST L: THE BLOWER MOTOR IS INOPERATIVE - EMTC

Normal Operation
Under normal operation, the blower motor relay coil receives ignition voltage through circuit CBP45 (YE). The coil receives ground from the HVAC module - electronic manual temperature control (EMTC) through circuit CH123 (VT/GN) if any function selector position but OFF is selected. Voltage is supplied to the relay switch contact through circuit CH402 (YE/GN). When the relay coil is energized, voltage is delivered to the blower motor through circuit CH402 (YE/GN)/(BK). Ground for the blower motor is provided through circuit CH430 (VT/OG)/(BK/RD) from the blower resistor or the blower switch (HI). The blower resistor and blower switch are grounded through circuit GD116 (BK/VT).

This pinpoint test is intended to diagnose the following:
- Fuse(s)
- Wiring, terminals or connectors
- HVAC module - EMTC
- Blower motor
- Blower motor relay
- Blower motor switch


L1:






L1-L4:






L4-L6:






L6 Continued:






L7:






L8-L9:






L9-L10: