Removal and Installation
COMBINATION METER
Removal and Installation
REMOVAL
1. Remove cluster lid A assembly. Removal and Installation A/T Models (A/T models) or (M/T models).
2. Remove screw (A) and remove combination meter stay (1).
3. Remove screws (B) and remove cluster lid A cover (2).
4. Remove screws (A), (B) and remove combination meter (1).
5. Remove meter control switch connector (2) from combination meter (1).
INSTALLATION
Install in the reverse order of removal.