Starter Relay: Testing and Inspection
2UZ-FE STARTING: STARTER RELAY: INSPECTION
INSPECTION
1. INSPECT STARTER RELAY ASSEMBLY
(a) Continuity inspection.
(1) Using an ohmmeter, check that there is continuity between each terminal.
Standard:
(b) Using an ohmmeter, check that there is continuity between terminals 3 and 5 when voltage is applied across terminals 1 and 2.
Specified condition:
Continuity