P0748
A760F AUTOMATIC TRANSMISSION / TRANSAXLE: AUTOMATIC TRANSMISSION SYSTEM: P0748: Pressure Control Solenoid "A" Electrical (Shift Solenoid Valve SL1)
P0748 - Pressure Control Solenoid "A" Electrical (Shift Solenoid Valve SL1)
DESCRIPTION
Shifting from 1st to 6th is performed in combination with the ON and OFF operation of shift solenoid valves SL1, SL2, S1, S2, S3, S4 and SR, which are controlled by the ECM. If an open or short circuit occurs in the shift solenoid valves, the ECM controls the remaining normal shift solenoid valves to allow the vehicle to be operated safely Fail-Safe Chart.
MONITOR DESCRIPTION
This DTC indicates an open or short in the shift solenoid valve SL1 circuit. The ECM commands gear shifts by turning the shift solenoid valves ON/OFF. When there is an open or short circuit in any shift solenoid valve circuit, the ECM detects the problem, illuminates the MIL and stores the DTC. Also, the ECM performs the fail-safe function and turns the other normal shift solenoid valves ON/OFF. In case of an open or short circuit, the ECM stops sending current to the open or short-circuited solenoid.
While driving and shifting between 4th and 5th gears, if the ECM detects an open or short in the shift solenoid valve SL1 circuit, the ECM determines that there is a malfunction Fail-Safe Chart.
MONITOR STRATEGY
TYPICAL ENABLING CONDITIONS
TYPICAL MALFUNCTION THRESHOLDS
COMPONENT OPERATING RANGE
WIRING DIAGRAM
INSPECTION PROCEDURE
NOTICE:
Perform the universal trip to clear permanent DTCs Reading and Clearing Diagnostic Trouble Codes.
HINT
Shift solenoid valve SL1 turns ON/OFF normally when the shift lever is in D:
PROCEDURE
1. INSPECT TRANSMISSION WIRE (SHIFT SOLENOID VALVE SL1)
(a) Disconnect the C24 transmission wire connector.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Text in Illustration
NG -- INSPECT SHIFT SOLENOID VALVE SL1
OK -- Continue to next step.
2. CHECK HARNESS AND CONNECTOR (TRANSMISSION WIRE - ECM)
(a) Disconnect the C30 ECM connector.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
Text in Illustration
NG -- REPAIR OR REPLACE HARNESS OR CONNECTOR
OK -- REPLACE ECM Removal
3. INSPECT SHIFT SOLENOID VALVE SL1
(a) Remove shift solenoid valve SL1.
(b) Measure the resistance according to the value(s) in the table below.
Standard Resistance:
(c) Apply 12 V battery voltage to the shift solenoid valve and check that the valve moves and makes an operating noise.
OK:
Text in Illustration
NG -- REPLACE SHIFT SOLENOID VALVE SL1 Disassembly
OK -- REPAIR OR REPLACE TRANSMISSION WIRE Removal