Installation
2GR-FSE ENGINE MECHANICAL: DRIVE BELT: INSTALLATION
INSTALLATION
1. INSTALL FAN AND GENERATOR V BELT
(a) Rotate the tensioner pulley counterclockwise, and then install the V belt as shown in the illustration.
NOTICE:
Check that the drive belt is properly set to each pulley.
2. INSTALL NO. 1 AIR CLEANER INLET
(a) Install the air cleaner inlet with the bolt.
Torque: 5.0 Nm (51 kgf-cm, 44in-lbf)
3. INSTALL COOL AIR INTAKE DUCT SEAL Installation