Operation CHARM: Car repair manuals for everyone.

Fuel Door Release Cable: Testing and Inspection





ENGINE HOOD / DOOR: FUEL LID LOCK CONTROL CABLE ASSEMBLY: INSPECTION

1. INSPECT LUGGAGE DOOR OPENING SWITCH ASSEMBLY (FUEL LID OPENING SWITCH)





(a) Measure the resistance of the switch.

Standard resistance:





* If the result is not as specified, replace the switch assembly.

2. INSPECT FUEL LID LOCK CONTROL CABLE SUB-ASSEMBLY (FUEL LID OPENER MOTOR)





(a) Check the operation of the motor.

(1) Apply battery voltage to the motor and check the operation of the motor.

OK:





* If the result is not as specified, replace the cable sub-assembly.

(b) Measure the shaft strokes.

Standard stroke:

10.3 mm (0.406 in.) or more

(b) If the result is not as specified, replace the cable sub-assembly.