Inspection
PTC ELEMENTS HEATER
Inspection
EQUIPOTENTIAL TEST
After installing PTC elements heater, measure the resistance below.
- Between PTC elements heater (bonding wire stud bolt) and body (ground bolt).
- Between PTC elements heater (bonding wire stud bolt) and electric compressor (aluminum part).
WARNING:
To prevent electric shock hazards, be sure to wear protective gear.
Standard: Less than 0.1
If the result deviates from the standard value, check for paint, oil, dirt, or other substance adhering to the bolts or conductive mounting parts. If such substances are found, clean the surrounding area and remove the foreign substances.