Installation
METER / GAUGE / DISPLAY: LIGHT CONTROL RHEOSTAT: INSTALLATION; 2013 MY FR-S [03/2012 -]
1. INSTALL LIGHT CONTROL RHEOSTAT
(a) Engage the 2 claws to install the light control rheostat.
2. INSTALL SWITCH BASE
(a) Engage the 4 claws to install the switch base.
3. INSTALL NO. 1 INSTRUMENT PANEL UNDER COVER SUB-ASSEMBLY
(a) Connect each connector.
(b) Engage the 4 claws.
(c) Engage the 4 clips to install the No. 1 instrument panel under cover sub-assembly.
(d) Install the 2 screws.
4. INSTALL INSTRUMENT SIDE PANEL LH Installation